Cummins/Onan OTPCA — Service Procedure
For the Cummins/Onan OTPCA.
Browse Cummins/Onan generators & specs →
Procedure
- 1. Place the motor disconnect switch in the Off position, and both generator selector switches into the OFF position.
- 2. Place the transfer switch in the Source 1 posi- tion.
- 3. Place the Off–Manual–Auto selector switch on the Source 1 genset control in the Auto posi- tion. The genset will start and supply power to the load (the load will be energized and TDECa may be timing).
- 4. Use the PC Service tool or the Test sub-menu to set this genset as the preferred source.
- 5. Wait for TDECa to finish timing.
- 6. Place the Off–Manual–Auto selector switch on the backup genset (Source 2) control in the Auto position.
- 7. Place the motor disconnect switch in the Auto position.
- 8. If desired, use the Time Delay sub-menus un- der Setup or use the PC Service tool to enable the changeover timer and specify a change- over delay time period. Testing the System by Turning Off the Preferred Source:
Source: manual:962-0516A Onan OTPC (40-1000 Amp) Transfer Switch Service manual (10-2002).pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.