Cummins/Onan — The following procedures cover the removal and
A Cummins/Onan service procedure — check it applies to your exact model before use.
Browse Cummins/Onan generators & specs →
Procedure
- Ampere switches.
- Remove the linear actuator as described in Linear
- to 100 Ampere switches. Follow steps 1 - 6 in
- Remove the round head machine screws, locking
- ; and remove the interlock bar.
- Remove the pan head screws (2), locking
- Disconnect the control wiring leads from the
- Remove the hex head machine screws, ring ter-
- to the load bus bars.
- Remove the hex head machine screws and spring
- Remove the control wiring leads from the power
- On front connect switches, loosen the lug termi-
- Remove the two round head machine screws,
- On front connect switches, remove the round
- Applya thin coat of electric joint compound to the
- to 32 in-lbs (3.2 to 3.6 Nom) torque.
- Install the arc chute barriers (new), arc chutes
- Hold switch assembly in position on base and
- Secure switch assembly to base with round head
- Remove the pan head screws that secure the left
Source: manual:962-0504 Onan OT II series (spec E-F) Transfer Switch Service manual (12-1988).pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.