Home›Repair guides›Cummins/Onan›Flowing the Pump (PLB timing)

Cummins/Onan — Flowing the Pump (PLB timing)

Adjustments · PLB injection pump

From a Cummins/Onan service manual covering: 2.5A, 2.5L, 2.7 AJ, 4.0CCK, 6.0CCKB, 6.5 NH, JC - 3CR / 96 T. Check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Procedure

  1. Install pump with .006-inch (0.15 mm) shims between pump and pad.
  2. Loosen delivery valve holder to relieve pressure on spring.
  3. Rotate flywheel to about 15 degrees before port closing point.
  4. Operate transfer pump hand primer lever and rotate flywheel slowly clockwise until fuel stops coming out of pump outlet.
  5. Measure distance from port closing point to PC mark and add shims per table.
  6. Install pump.

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →