Cummins/Onan AT U C D ‘400 - 4X / 11 10 C — Service Procedure
For the Cummins/Onan AT U C D ‘400 - 4X / 11 10 C.
Browse Cummins/Onan generators & specs →
Procedure
- Open the front door of the cabinet.
- Move operation selector switch to “STOP”
- Disconnect the starting battery.
- Remove the AC line voltage from the automatic
- Remove the twist-lock disconnect plug and pull
- 400 ampere AT only: Remove the one screw from
- Remove the one screw on top and one screw on
- Swing the meter-lamp panel outward.
- Disconnect the meter-lamp panel wire leadsfrom
- Remove the four nuts and washers holding the
- Mount the new meter-lamp panel on the cabinet
- Connect the wire leads as marked, from the
- Close the meter-lamp panel and secure the top
- 400 ampere AT only: Shut the left cabinet door.
- Close the control accessory panel and reconnect
- Restore AC line voltqge to the automatic transfer
- Move the operation.selector switch to “RMT” (on
- Reconnect starting battery.
- Close.cabinet door.
Source: manual:962-0500 Onan AT (spec A-C) Transfer Switch Service Manual (08-1979).pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.