Cummins/Onan DJ30 — Time Injection Pump - Flowing the Pump Method
Adjustments
For the Cummins/Onan DJ30, from the Cummins/Onan service manual.
Applies to: Onan (Onan Division of Studebaker Corporation, Minneapolis, Minnesota) Spec T, Cummins/Onan DJA engine
Before you start
- Injection pump must be timed on the compression stroke, not the exhaust stroke
Procedure
- Install pump with 0.006-inch shims between pump and pad.
- Loosen the delivery valve holder to relieve pressure on the spring.
- Rotate the flywheel to about 15 degrees before the port closing point.
- Blow in the pump inlet and rotate flywheel clockwise until air stops leaving the outlet.
- Measure the distance to the PC mark and select shims from the chart.
- Install the pump.
Specs & values
- Port closing 17 degrees BTC
Full service-parts list: Onan (Onan Division of Studebaker Corporation, Minneapolis, Minnesota) Spec T →
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.