Home›Repair guides›Cummins/Onan›Binding (Self-Installation)

Cummins/Onan — Binding (Self-Installation)

Installation · Annunciator

From a Cummins/Onan service manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Procedure

  1. Make sure the Annunciator, Genset and/or ATS LONWORKS modules are all powered and all are connected to the twisted-pair data bus.
  2. Make sure S2-5 and S2-6 are configured for the desired Annunciation.
  3. Install the front panel assembly into enclosure or panel.
  4. The front panel Network Status lamp should be on (amber) indicating it is powered but not bound.
  5. Press and hold the Silence/Lamp Test button until the Network Status lamp begins flashing (amber).
  6. Release the Silence/Lamp Test button.

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →