Home›Repair guides›Cummins/Onan›Alternator Assembly (PTO and Two Bearing)

Cummins/Onan — Alternator Assembly (PTO and Two Bearing)

Repair & overhaul · YD PTO / Two Bearing alternator

From a Cummins/Onan service manual covering: 15.0YD-3G, 20.0YD-3G, 20.0YD-5DG, 25.0YD-3G, 25.0YD-5DG, 30.0YD-3G, 30.0YD-5DG, 6.0-3CS1, 7.5-3CS1. Check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Procedure

  1. Clean and inspect all mating surfaces.
  2. Coat mating area between alternator bearing and end bell bearing hole with a thin film of Molykote.
  3. Install rotor-through-stud in drive pinion shaft if removed.
  4. Install rotor and fan assembly on adapter.
  5. If removed, install exciter rotor and shaft bearing; torque shaft nut against exciter rotor 130 to 150 ft. lbs. (176 to 203 Nm).
  6. Install two stator through-studs in adapter for aligning.
  7. Install baffle ring.
  8. Install remaining two stator through-studs.
  9. Install stator and end bell; torque nuts 19 to 21 ft-lbs (26 to 28 Nm).
  10. Torque down rotor-through-stud nut to 55-60 ft. lb (75-81 Nm).
  11. Install mounting feet and control box.
  12. Connect alternator output and control leads.
  13. Replace end bell cover and control box cover.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Shaft nut against exciter rotor: 130 to 150 ft. lbs. (176 to 203 Nm)
  • Stator through-stud nuts: 19 to 21 ft-lbs (26 to 28 Nm)
  • Rotor-through-stud nut: 55-60 ft. lb (75-81 Nm)

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →