Home›Repair guides›Cummins/Onan›Starting the plant electrically

Cummins/Onan 1B Series / 1B Series Plant — Starting the plant electrically

Operation · engine-generator

For the Cummins/Onan 1B Series / 1B Series Plant, from the Cummins/Onan operator's manual.

Browse Cummins/Onan generators & specs →

Before you start

  • Never start or operate the battery charging plant unless the batteries are connected to the plant.

Procedure

  1. Make sure fuel shut-off valve in fuel tank is fully open.
  2. If equipped with fuel pump, operate primer lever until carburetor bowl is full of gasoline.
  3. On DC units, be sure switch connecting batteries to plant is closed. Never start or operate battery charging plant unless batteries are connected.
  4. Pull choke out all the way.
  5. Press start button firmly for five to ten seconds, then release.
  6. If plant fails to start, push choke half way in and repeat. Do not press start button continuously.
  7. If battery is discharged, start manually.

Source: Cummins/Onan operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →