Cummins/Onan 15.0 HA / 7.5 HA — Cranking Limiter Test
Testing & diagnosis
For the Cummins/Onan 15.0 HA / 7.5 HA, from the Cummins/Onan service manual.
Browse Cummins/Onan generators & specs →
Procedure
- Check continuity of the heater and check for heating during a starting cycle.
- To test circuit breaking, disconnect the generator set remote start lead (terminal 3, remote) and apply a load.
- The start-run relay should operate immediately.
- After any start time delay and bilge blower time delay (begin Spec D only), the cranking limiter should heat.
- After 45 to 90 seconds, the limiter should open.
Specs & values
- 45 to 90 seconds
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.