Home›Repair guides›Chrysler›Preparation for Storage

Chrysler — Preparation for Storage

Maintenance · engine

From a Chrysler operator's manual covering: IND. 52, IND. 53, IND. 54, IND. 56. Check it applies to your exact model before use.

Procedure

  1. Drain lubricating oil from engine and add 2-1/2 quarts Rust Preventive Oil.
  2. Drain cooling system, add MOPAR Rust Resistor and fill with clean water.
  3. Run engine at idle speed for three or four minutes avoiding overheating.
  4. Remove top of carburetor air cleaner and pour 3/4 pint Rust Preventive Oil through carburetor air intake at approximately 1000 rpm.
  5. Turn off ignition as soon as oil has been drawn into combustion chamber.
  6. Drain Rust Preventive Oil from crankcase.
  7. Remove spark plugs and pour one ounce of Rust Preventive Oil into each spark plug opening.
  8. Turn engine over four or five revolutions with starting motor and install plugs.
  9. Drain cooling system.
  10. Drain fuel system tank, fuel pump and filter and carburetor.
  11. Operate carburetor throttle lever several times to empty accelerator pump system.
  12. Remove carburetor air cleaner, oil filler cap air cleaner and outlet ventilator pipe air cleaner; seal openings.
  13. Replace oil filter element after cleaning filter housing.
  14. Remove storage battery and store in cool, dry place.
  15. Protect engine with waterproof cover if exposed to weather.

Source: Chrysler operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Chrysler repair guides →