Home›Repair guides›Champion›Return to Service after Storage

Champion 100515 — Return to Service after Storage

Operation · Generator

For the Champion 100515, from the Champion operator's manual.

Before you start

  • Always connect positive battery cable first

Procedure

  1. Make sure utility power to transfer switch is off.
  2. Engine control module switch and ATS control module switch in OFF position.
  3. Check engine oil level; add if needed.
  4. Recharge batteries to 100% state of charge; replace if won't fully charge.
  5. Connect positive battery cable first, then negative.
  6. Clean and wipe down generator.
  7. Turn fuel shutoff valve to ON.
  8. Turn engine control module switch to manual; run engine 15 minutes to warm up.
  9. Verify no active fault codes.
  10. Turn engine control module switch to OFF to shut off engine.
  11. Turn ATS module switch to AUTO.
  12. Turn on utility power to transfer switch.
  13. Turn engine control module switch to ATS position.
  14. Set the exercise time.

Source: Champion operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Champion repair guides →