Caterpillar — Refer to Testing and Adjusting, "Fuel Injection Timing - Check".: Disassembly and Assembly
A Caterpillar service procedure — check it applies to your exact model before use.
Browse Caterpillar generators & specs →
Procedure
- 2. Use Tooling (D) in order to lubricate O-ring seal (10). Install a new O-ring seal (10) onto
- 3. Install new washers to bolts (13).
- 4. Align the holes in the fuel injection pump with the holes in the front housing. Install the fuel
- 5. Install bolts (13). Tighten bolts (13) to a torque of 22 N·m (16 lb ft).
- 6. Position support bracket (11) onto the cylinder block. Install bolt (15) finger tight.
- 7. Install bolt (12) and nut (14) finger tight.
- 8. Tighten bolt (12) and nut (14) to a torque of 22 N·m (16 lb ft). Tighten bolt (15) to a torque
- 9. Position fuel injection pump gear (9) on the shaft of the fuel injection pump. Install the
- 10. Connect the harness assembly to timing advance solenoid (7).
- 11. Connect harness assembly (2). Connect fuel line (3).
- 12. Connect fuel return line (1). Connect tube assembly (4) to the fuel injection pump.
- 13. Loosen bolt (5). Move spacer (6) in order to prevent bolt (5) from tightening against the
- 14. Tighten nut (8) to a torque of 88 N·m (65 lb ft).
- 15. Remove Tooling (A) and Tooling (B).
- a. Install the front cover. Refer to Disassembly and Assembly, "Front Cover - Remove and
- b. Install the crankshaft pulley. Refer to Disassembly and Assembly, "Crankshaft Pulley -
- c. Install the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines -
- d. Install the air compressor, if equipped. Refer to Disassembly and Assembly, "Air
Source: manual:SM-Caterpillar-Cat-3054C-INDUSTRIAL-ENGINE-33400001.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.