Caterpillar — Refer to Testing and Adjusting, "Fuel Injection Timing - Check".: Disassembly and Assembly
A Caterpillar service procedure — check it applies to your exact model before use.
Browse Caterpillar generators & specs →
Procedure
- 2. Install O-ring seal (9) on the fuel injection pump. Position the fuel injection pump on the
- 3. If necessary, install the bolt and bracket (10) on the cylinder block. Tighten the bolt to a
- 4. Install bolt (11) and nut (13).
- 5. Position fuel injection pump gear (8) on the shaft of the fuel injection pump. Install the
- 6. Connect the wiring harness assembly to engine shutoff solenoid (4).
- 7. Connect the wiring harness assembly to cold start advance unit (3).
- 8. Connect tube assembly (2) to the fuel injection pump. Connect tube assembly (1) to the fuel
- 9. Loosen bolt (6). Move spacer (5) in order to prevent bolt (6) from tightening against the
- 10. Tighten nut (7) to a torque of 88 N·m (65 lb ft).
- 11. Remove Tooling (A) and Tooling (B).
- a. Install the front cover. Refer to Disassembly and Assembly, "Front Cover - Remove and
- b. Install the crankshaft pulley. Refer to Disassembly and Assembly, "Crankshaft Pulley -
- c. Install the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines -
- d. Install the air compressor, if equipped. Refer to Disassembly and Assembly, "Air
Source: manual:SM-Caterpillar-Cat-3054C-INDUSTRIAL-ENGINE-33400001.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.