Caterpillar — Polemaster Reel Installation and Operation
A Caterpillar service procedure — check it applies to your exact model before use.
Browse Caterpillar generators & specs →
Procedure
- Install the polemaster reel on the shaft and insert lock pin.
- Feed pilot rope through rollers on levelwind on rear of unit and on to reel going over the top.
- Unit is now ready for operation.
- Connect quick disconnects, crank power supply and let idle for a few minutes before increasing to full throttle.
- Use valve on control console or power unit to payout or pull in rope as required.
- Evenly lay rope onto reel with levelwind.
- After pullback is complete, shut down the power supply.
Source: manual:4934_T30-36-BWRC-Operators-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.