HomeRepair guidesPolemaster Reel Installation and Operation

Caterpillar — Polemaster Reel Installation and Operation

A Caterpillar service procedure — check it applies to your exact model before use.

Browse Caterpillar generators & specs →

Procedure

  1. Install the polemaster reel on the shaft and insert lock pin.
  2. Feed pilot rope through rollers on levelwind on rear of unit and on to reel going over the top.
  3. Unit is now ready for operation.
  4. Connect quick disconnects, crank power supply and let idle for a few minutes before increasing to full throttle.
  5. Use valve on control console or power unit to payout or pull in rope as required.
  6. Evenly lay rope onto reel with levelwind.
  7. After pullback is complete, shut down the power supply.

Source: manual:4934_T30-36-BWRC-Operators-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.