Home›Repair guides›Caterpillar›Generator Bearing - Inspect/Replace (SR4 Generator)

Caterpillar — Generator Bearing - Inspect/Replace (SR4 Generator)

Repair & overhaul

From a Caterpillar owner's manual covering: C3.3, C3.3 Rental Generator Set, C4.4, C4.4 Rental Generator Set, D4D1-Up, GLE1-Up, N3X1-UP, N4R1-Up, N4X1-Up, X3B1-UP, XYC1-Up, XYD1-Up. Check it applies to your exact model before use.

Applies to: Caterpillar C3.3, Caterpillar C4.4

Before you start

  • DO NOT MIX GREASES
  • On two-bearing generators the front bearing can only be removed after the drive coupling is removed

Procedure

  1. At every major engine overhaul remove the bearing bracket.
  2. Inspect bracket bore, bearing outer race and rolling elements.
  3. On standby power units inspect bearing and replace grease at three year intervals.
  4. Inspect the sleeve for out of roundness, excessive wear and bracket step less than 0.0762 mm (0.0030 inch).
  5. Clean all ball bearings. Repack the bracket cavity with 2S-3230 Grease (one-third to one-half cavity volume).
  6. Use an induction heater to heat ball bearings to 107 C (224.6 F) for ten minutes to install.
  7. Heat the hub to 400 C (752.0 F) for three hours to reinstall the hub on the shaft.
  8. Remove the bracket drain plug and operate the generator for one hour.
  9. Stop the engine. Install the bracket drain plug. Wipe off excess grease.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Bracket step less than 0.0762 mm (0.0030 inch)
  • Bearings heated to 107 C (224.6 F) for ten minutes
  • Hub heated to 400 C (752.0 F) for three hours
  • Grease 2S-3230 Amazon eBay

Full service-parts list: Caterpillar C3.3 →, Caterpillar C4.4 →

Source: Caterpillar owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Caterpillar repair guides →