Caterpillar — Procedure 5
A Caterpillar service procedure — check it applies to your exact model before use.
Browse Caterpillar generators & specs →
Procedure
- 2. Use tool (A) and the lifting device to align the flywheel housing (2) to the dowels (5). Install
- the flywheel housing to the engine.
- 3. Install the setscrews (1) that fasten the flywheel housing to the cylinder block.
- For C0.5 and C0.7 engines, tighten the setscrews to a torque of 15 N·m (11 lb ft).
- For C1.1/3011C and C1.6 engines, tighten the setscrews to a torque of 50 N·m (37 lb ft).
- For C1.5/3013C engines, tighten the setscrews to a torque of 25 N·m (19 lb ft).
- 4. Remove tool (A) and the lifting device from the flywheel housing.
- End By:
- a. Install the flywheel. Refer to Disassembly and Assembly, "Flywheel - Install".
Tools required
- 4. Remove tool (A) and the lifting device from the flywheel housing.
- 2. Use tool (A) and the lifting device to align the flywheel housing (2) to the dowels (5). Install
Specs & torque values
- 50 N·m
- 25 N·m
- 15 N·m
Source: manual:216-Skid-Steer-Loader-Service-Manual-4NZ03400.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.