HomeRepair guidesTest 3: Check Trickle Charge at Battery: Test 4: Check Trickle Charge Fuse at Control Panel

Briggs & Stratton — Test 3: Check Trickle Charge at Battery: Test 4: Check Trickle Charge Fuse at Control Panel

For these Briggs & Stratton models: 10 kW, 8 kW.

Browse Briggs & Stratton generators & specs →

Procedure

  1. 15. See Figure A4. Measure AC voltage at terminals of Connector J5. Is approximately 240 VAC present?
  2. A. Yes- Move to step 16.
  3. B. No- Return to Test 2: Check Utility Voltage Input (step 12).
  4. 16. See Figure A7. Set Digital Multimeter to read DC volts. Connect battery cables. Measure DC voltage
  5. A. Yes- Retest.
  6. B. No- Move to Test 4: Check Trickle Charge Fuse at Control Panel (step 17).