HomeRepair guidesA. Yes- Move to Test 5: Check Starter Relay Signal (step 19).: Test 2: Check Utility Voltage Input

Briggs & Stratton — A. Yes- Move to Test 5: Check Starter Relay Signal (step 19).: Test 2: Check Utility Voltage Input

For these Briggs & Stratton models: 10 kW, 8 kW.

Browse Briggs & Stratton generators & specs →

Procedure

  1. B. No- Move to step 9.
  2. 9. See Figure A3. Measure DC voltage from Pin 1 of Connector J3 to battery negative (-) post. Is voltage
  3. A. Yes- Move to step 11.
  4. B. No- Move to step 10.
  5. 10. Inspect all wiring and connections at back of control panel. Look for wires that are nicked, kinked,
  6. A. Yes- Repair or replace as necessary. Retest.
  7. B. No- Return to step 8.
  8. 11. Check the condition of all wires, cables, and connectors in unit. Pay particular attention to ground
  9. A. Yes- Repair or replace as necessary. Retest.
  10. B. No- Move to Test 5: Check Starter Relay Signal (step 19).

Source: manual:Briggs_Air-CooledRepairManual80019677.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.