Briggs & Stratton — A. Yes- Move to Test 5: Check Starter Relay Signal (step 19).: Test 2: Check Utility Voltage Input
For these Briggs & Stratton models: 10 kW, 8 kW.
Browse Briggs & Stratton generators & specs →
Procedure
- B. No- Move to step 9.
- 9. See Figure A3. Measure DC voltage from Pin 1 of Connector J3 to battery negative (-) post. Is voltage
- A. Yes- Move to step 11.
- B. No- Move to step 10.
- 10. Inspect all wiring and connections at back of control panel. Look for wires that are nicked, kinked,
- A. Yes- Repair or replace as necessary. Retest.
- B. No- Return to step 8.
- 11. Check the condition of all wires, cables, and connectors in unit. Pay particular attention to ground
- A. Yes- Repair or replace as necessary. Retest.
- B. No- Move to Test 5: Check Starter Relay Signal (step 19).
Source: manual:Briggs_Air-CooledRepairManual80019677.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.