HomeRepair guidesA. Yes- Move to Test 3: Check Trickle Charge at Battery (step 15).

Briggs & Stratton — A. Yes- Move to Test 3: Check Trickle Charge at Battery (step 15).

For these Briggs & Stratton models: 10 kW, 8 kW.

Browse Briggs & Stratton generators & specs →

Procedure

  1. B. No- Move to step 13.
  2. 13. See Figure A5. Measure AC voltage on the bottom side of two transfer switch fuses. Is approximately
  3. 240 VAC present?
  4. A. Yes- Repair or replace wiring between transfer switch and generator. Retest.
  5. B. No- Move to step 14.
  6. 14. See Figure A6. Measure AC voltage on the top side of two transfer switch fuses. Is approximately
  7. 240 VAC present?
  8. A. Yes- See inset of Figure A6. Remove fuses and test for continuity. Replace open fuse(s). Retest.
  9. B. No- Repair or replace transfer switch wiring. Retest.

Source: manual:Briggs_Air-CooledRepairManual80019677.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.