Aurora Generators — Manual Operation
Operation · Manual override lever
From a Aurora Generators service manual covering: EGSC100ASE, EGSC200ASE, EGSC400ASE, EGSCA100ASE, EGSCA200ASE, EGSCA400ASE. Check it applies to your exact model before use.
Browse Aurora Generators generators & specs →
Before you start
- Do not attempt to manually operate the ATS with the utility or generator available.
- Do not manually transfer the switch while under load.
- Disconnect line power by opening and locking out, if possible, the next highest disconnect device.
- Always turn the utility power off and turn the generator control selector switch to 'OFF' and generator main breaker to 'OFF' before attempting a manual transfer.
- Insure the deadfront is installed prior to energizing the transfer switch.
Procedure
- Disconnect all sources of power.
- Remove lower deadfront on 100A and 200A switches. Locate the manual lever between the solenoids.
- Locate the handle used to manually transfer the switch.
- Attach the handle to the manual lever.
- Move the lever up to go to utility or move the lever down to go to generator.
- Reconnect the power.
Source: Aurora Generators service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.