Home›Repair guides›Aurora Generators›Manual Operation

Aurora Generators — Manual Operation

Operation · Manual override lever

From a Aurora Generators service manual covering: EGSC100ASE, EGSC200ASE, EGSC400ASE, EGSCA100ASE, EGSCA200ASE, EGSCA400ASE. Check it applies to your exact model before use.

Browse Aurora Generators generators & specs →

Before you start

  • Do not attempt to manually operate the ATS with the utility or generator available.
  • Do not manually transfer the switch while under load.
  • Disconnect line power by opening and locking out, if possible, the next highest disconnect device.
  • Always turn the utility power off and turn the generator control selector switch to 'OFF' and generator main breaker to 'OFF' before attempting a manual transfer.
  • Insure the deadfront is installed prior to energizing the transfer switch.

Procedure

  1. Disconnect all sources of power.
  2. Remove lower deadfront on 100A and 200A switches. Locate the manual lever between the solenoids.
  3. Locate the handle used to manually transfer the switch.
  4. Attach the handle to the manual lever.
  5. Move the lever up to go to utility or move the lever down to go to generator.
  6. Reconnect the power.

Source: Aurora Generators service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Aurora Generators repair guides →