Aurora Generators — Control Wires (Generator Start Connection)

Installation · RTC-100 controller terminal blocks, fuses F1/F2/T1

From a Aurora Generators service manual covering: EGSC100ASE, EGSC200ASE, EGSC400ASE, EGSCA100ASE, EGSCA200ASE, EGSCA400ASE. Check it applies to your exact model before use.

Browse Aurora Generators generators & specs →

Before you start

  • Power conductors and control wiring may have voltage present that can cause severe personal injury or death. De-energize all power or control circuit conductors before performing any wiring activity.
  • Set the generator control selector switch to the OFF position prior to making the generator start connection.
  • Control wiring such as the generator start wires must be run in a separate conduit from the power cables.

Procedure

  1. Connect Generator N1 to Fuse F1.
  2. Connect Generator N2 to Fuse F2.
  3. Connect Generator T1 (Battery Charger) to ATS fuse T1.
  4. EGSC* switches require 23 and 194 connection from Genset (do not require '0' DC Common).
  5. EGSCA* switches do not require Genset 0, 23 or 194 connection.
  6. Connect the generator and load ground cable to the generator and load ground lugs on the ground bar assembly.

Specs & values

  • Pins 1-2 are NO, pins 2-3 are NC
  • PN's starting with EGSC require Qty 5 control wires N1 (F1), N2 (F2), T1, 23 & 194
  • PN's starting with EGSCA require Qty 3 control wires N1 (F1), N2 (F2), T1
  • PN's starting with EGSCA with Engine Start generators require Qty 2-3 wires from RTC-100 Controller J7

Source: Aurora Generators service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.