Aurora — Install Low-Pressure Fuel Line - Basic
A Aurora service procedure — check it applies to your exact model before use.
Browse Aurora generators & specs →
Procedure
- Position new hose clamp onto hose
- Install hose onto connection
- Reposition the new hose clamp into the positions noted on removal
- Install nut onto the bolt and torque to 10 N·m (89 lb in)
Tools required
- suitable tool
Specs & torque values
- Torque: 10 N·m (89 lb in)
Source: manual:perkins_m0103175_disassembly_assembly.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.