Home›Repair guides›Allmand›Replacing Valve Sections

Allmand — Replacing Valve Sections

Repair & overhaul · Gresen V-10 control valve

From a Allmand operator's manual — check it applies to your exact model before use.

Before you start

  • Do not prelube O-ring section seals prior to installation.
  • If stud nuts are not tightened to proper torque, valve spools may bind or stick, or cause O-ring seals to extrude.

Procedure

  1. Remove handle assembly from section being removed.
  2. Remove valve from backhoe.
  3. Thoroughly clean valve assembly.
  4. Mark each section numerically to avoid incorrect reassembly.
  5. Remove four hex nuts and lock washers from right (outlet cover) end of valve.
  6. Slide outlet cover and each section off tie rods.
  7. Replace sections as needed and reassemble valve.
  8. Torque stud nuts evenly to 15 ft. lbs.
  9. Reinstall handle assembly using Loctite 242 (blue) on all screws.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Stud nuts torque: 15 ft. lbs.

Source: Allmand operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Allmand repair guides →