Service parts for the G3508
Grouped by system, with how many of each the parts manual calls for.
Oil system
1 requiredPrices captured from merchant listings; some links are affiliate links. Confirm against your serial number before ordering.
Specifications
| Fuel | natural gas |
|---|---|
| Frequency | 60.0 Hz |
| Prime power | 370 kW |
| Oil capacity | 356.0 L |
Engine
| Oil capacity | 356.0 L |
|---|---|
| Coolant capacity | 114.0 L |
| Displacement | 34.5 L |
| Aspiration | TA |
| Rated speed | 1200 rpm |
Maintenance & consumables
for the Caterpillar G3508| Item | Spec | Capacity | Part # | Interval | |
|---|---|---|---|---|---|
| Oil filter | Engine Oil | 1R-0716 | Amazon eBay $44.90 eBay $44.90 NAPA $33.79 NAPA $33.79 KuduParts $80.00 FridayParts $81.99 |
Service intervals
4| Item | Action | Hours | Months | Notes |
|---|---|---|---|---|
| oil | Change | 500 hr | 3000 Series service intervals increased to 500 hours as standard (3013C, 3024C, 3054, 3056) | |
| minor overhaul | Other | 20000 hr | 3600 engines designed to run 20 000 hours between minor overhauls using No. 2 fuel | |
| major overhaul | Other | 40000 hr | 3600 engines designed to run 40 000 hours between major overhauls using No. 2 fuel | |
| cylinder liners and pistons | Other | 80000 hr | 3600 cylinder liners and pistons designed for 80 000 hours using No. 2 fuel |
Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.
Service specifications
31| Type | Item | Value | Unit | Condition |
|---|---|---|---|---|
| Clearance | Crankshaft end play | .178 to .635 | mm (0.0070 to 0.0250 inch) | measured with dial indicator |
| Clearance | Crankshaft end play after assembly | 0.178 to 0.635 | mm (0.0070 to 0.0250 inch) | after assembly |
| Clearance | End play at heat sink after assembly | 0.076 to 0.635 | mm (0.0030 to 0.0250 inch) | after assembly |
| Clearance | Gap at 3, 6, 9, 12 o'clock positions | 0.03 to 0.13 | mm (0.001 to 0.005 inch) | between |
| Clearance | Gap between generator and flywheel housing at locations (E), (F), (G), (H) | >0.03 and <0.13 | mm (0.001 inch to 0.005 inch) | more than 0.03 mm and less than 0.13 mm |
| Clearance | Generator forward offset from midpoint of end play | + 0.50 | mm (+ 0.0200 inch) | while generator supported by crane |
| Clearance | Rotor end play | 3.81 to 7.62 | mm (.150 to .300 inch) | approximately |
| Clearance | Shim thickness divisor for number of shims | 0.8 | mm (0.03 inch) | divide Letter L by this value |
| Clearance | Support deflection during bolt tightening | 0.13 | mm (0.005 inch) | maximum allowed movement |
| Other | Gross Input Torque (TH55-E70) | 12 667 | N•m (9350 lb-ft) | |
| Other | Gross Input Torque (TH55-E90) | 12 677 | N•m (9350 lb-ft) | |
| Other | Rating condition (diesel 7 L and higher) | 99 kPa (29.31 in Hg) dry barometer, 25°C (77°F) | SAE J1995 inlet air standard | |
| Other | Rating condition (diesel up to 6.6 L) | 100 kPa (29.5 in Hg) total barometric pressure, 1 kPa (.295 in Hg) vapor pressure, 25°C (77°F) | ISO/TR14396 inlet air standard | |
| Other | Rating condition (gas) | 100 kPa (29.61 in Hg) and 25°C (77°F) | SAE J1349 standard | |
| Other | Stall Torque Ratio (TH55-E70) | 2.23 | ||
| Other | Stall Torque Ratio (TH55-E90) | 2.23 | ||
| Pressure | Explosion relief valve opening pressure | 1.6 psi (11 kPa) | psi (kPa) | per valve |
| Pressure | Gas Pressure | 35 | psi (242 kPa) | |
| Pressure | Unit injector fuel injection pressure | 1240 | bar (18 000 psi) | |
| Pressure | WS255 pump plunger load | 238,000 | lb (107,960 kg) | |
| Pressure | WS273XD pump plunger load | 275,000 | lb (124 738 kg) | |
| Pressure | WS305XD pump plunger load | 250,000 | lb (113 398 kg) | |
| Speed | Engine Speed | 1400 | rpm | |
| Speed | Maximum Input Speed (TH55-E70/TH55-E90 transmissions) | 1970 | rpm | |
| Speed | Rated Input Speed (TH55-E70/TH55-E90 transmissions) | 1900 | rpm | |
| Torque | Bolts (10) | 100 | N-m (75 lb ft) | Tighten in pairs at 180 degree intervals in three stages |
| Torque | Bolts (7) for shim pack and plate assembly | 525 + 45 | N-m (390 + 30 lb ft) | Tighten bolts (7) |
| Torque | Coupling plate assembly bolts (5) | 525 + 25 | N-m (390 + 20 lb ft) | Tighten in 180 degree intervals in three stages |
| Torque | Fan mounting bolts (11) | 200 | N-m (150 Ib ft) | Tighten in pairs at 180 degree intervals in three stages |
| Torque | Generator mounting bolts (half of standard torque) | 450 | N-m (332 lb ft) | one half of standard torque |
| Torque | Generator support bolts (half of final torque) | 450 | N-m (332 Ib ft) | half of final torque |
Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.
Recommended fluids
| Fluid | Grade | Standard | Ambient | Capacity | Notes |
|---|---|---|---|---|---|
| Coolant | Cat DEAC | Diesel; 3,000 Service Hours or Three Years; annual S·O·SSM Level 2 coolant sampling and analysis | |||
| Coolant | Cat ELC | Diesel; 12,000 Service Hours or Six Years; add Cat ELC Extender at 6,000 service hours or one half of service life; annual S·O·SSM Level 2 coolant sampling and analysis | |||
| Coolant | Cat NGEC | Natural Gas; 16,000 Service Hours or Three Years; use interval that occurs first | |||
| Engine oil | EPA 2D 89.330-96 (fuel reference, Diesel <6.6 L, density 0,845-0,850 kg/L a 15 °C) | Reference condition only, not a lubricant recommendation | |||
| Engine oil | Cat NGEO | Natural Gas | |||
| Engine oil | low sulfated ash oil | Required for U.S. EPA Tier 4 Final, EU Stage IV engines. | |||
| Engine oil | Cat Arctic DEO SYN SAE 0W-30 | -40°C to 30°C | Engine Crankcase; Industrial Engines | ||
| Engine oil | Cat DEO SYN SAE 5W-40 | -30°C to 50°C | Engine Crankcase; Industrial Engines | ||
| Engine oil | Cat DEO SAE 10W-30 | -18°C to 40°C | Engine Crankcase; Industrial Engines | ||
| Engine oil | Cat DEO SAE 15W-40 | -9°C to 50°C | Engine Crankcase; Industrial Engines | ||
| Fuel | Ultra Low Sulfur Diesel (ULSD) | Contains less than or equal to 15 parts per million sulfur (mg/kg); required for U.S. EPA Tier 4 Final, EU Stage IV engines. B20 biodiesel capability available. | |||
| Fuel | 35° API gravity, LHV 42 780 kJ/kg (18,390 btu/lb) | SAE J1995 | Diesel engines 7 liter and higher; used at 29°C (84.2°F) with density 838.9 g/L | ||
| Fuel | EPA 2D 89.330-96 | EPA 2D 89.330-96 | Diesel engines up to 6.6 liter; density 0.845-0.850 kg/L @ 15°C (59°F); fuel inlet temperature 40°C (104°F) | ||
| Fuel | No. 2 fuel | 3600 engines designed for 80 000 hours on No. 2 fuel; ratings based on API gravity of 35 at 15 C (60 F), LHV of 42 780 kJ/kg used at 29 C (84 F) with a density of 838.9 g/L | |||
| Fuel | dry natural gas, LHV 35.54 MJ/Nm3 (905 btu/ft3) | Gas ratings based on SAE J1349 standard conditions of 100 kPa (29.61 in Hg) and 25°C (77°F) | |||
| Fuel | natural gas | LHV 35.54 MJ/Nm3 (905 Btu/cu-ft); pipeline natural gas HHV 39.7 MJ/Nm3 (1010 Btu/cu-ft); HD-5 propane HHV 104.0 MJ/Nm3 (2645 Btu/cu-ft) | |||
| Grease | Cat Generator Set Grease | Part Number 108-8611 |
Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.
Procedures
5Alignment Of Electric Sets With Supports At The Flywheel Housing / Installation Of A New Generator Or Flexible Plates adjustment
Tools: crane, dial indicator, shims, torque wrench
- Loosen all bolts connecting base to foundation; loosen all bolts fastening engine supports and generator supports to base.
- Ensure enough clearance between bolts and bolt holes in base, engine supports, generator supports at all locations.
- Check clearance between base and foundation at all mounting locations; use shims to prevent deflection; tighten base-to-foundation bolts to final torque.
- While generator supported by crane, loosen all bolts (2) fastening generator to flywheel housing; tighten alternate bolts to final torque; check clearance between base and engine and generator support
- Tighten all bolts fastening engine supports and generator supports to base to half of final torque; loosen all bolts (2); measure gap between generator and flywheel housing; ensure bolts centered in c
- Gaps at (E), (F), (G), (H) should be more than 0.03 mm (0.001 inch) and less than 0.13 mm (0.005 inch); adjust shims or move rear of generator right or left.
- After shim correction, tighten generator support bolts to half of final torque 450 N-m (332 Ib ft); check gaps; repeat until 0.13 mm (0.005 inch) or less; begin with Step 5.
- Install dial indicator on base with tip next to support mounting bolt (4); put tip on support (3); check while tightening bolt to final torque; if indicator moves more than 0.13 mm (0.005 inch), insta
Alignment Of Electric Sets Without Supports At The Flywheel Housing adjustment
Tools: shims, torque wrench
- Loosen all bolts connecting base to foundation; loosen all bolts fastening generator supports and engine supports to base.
- Ensure clearance between bolts and bolt holes in base, engine supports, generator supports at all locations.
- Check clearance between base and foundation at all mounting locations; use shims to prevent base deflection; tighten base-to-foundation bolts to final torque.
- Check clearance between base and engine, base and engine supports, base and generator supports over entire length; use shims to prevent support deflection; tighten all mounting bolts to final torque.
Rechecking The Alignment adjustment
Tools: torque wrench, shims
- Loosen the sixteen close coupled adapter bolts (2); visually ensure they are centered in clearance holes.
- Check gaps at 3, 6, 9, and 12 o'clock positions; use 2, 4, 8, and 10 o'clock if 12 and 6 are inaccessible.
- If gaps are between 0.03 mm (0.001 inch) and 0.13 mm (0.005 inch), tighten all bolts; alignment check complete. If not, loosen bolts fastening generator to base frame; adjust shims; move rear of gener
- After adjustment, tighten generator mounting bolts to one half of standard torque 450 N-m (332 lb ft); repeat procedure starting with Step 1.
Installation Of The Generator For Generator Sets That Are Equipped With A 3500 Engine installation
⚠ Damage to engine and generator can result if electric set is operated with a plate assembly that does not have proper clearance.
⚠ If N or O is less than initial A, disassemble and check coupling plate for bowing; replace if bowed.
Tools: dial indicator, straight edge, magnetic bases, crane, torque wrench, 17 5N-4478 Plates
- Ensure generator is disengaged from engine; clean generator support and base contact surfaces; remove protective material from flywheel pilot bearing bore and coupling contact surface.
- Remove two engine side covers; rotate engine until no. 1 crankshaft throw is perpendicular; measure crankshaft end play with dial indicator; record as A and divide by two for B.
- With crankshaft at extreme forward position, measure distance from straight edge to flywheel housing mounting surface (C) and flywheel pilot surface (D); subtract D from C for E.
- Remove coupling bolts and washers; remove plates, shims, and exhaust fan; lift rotor; locate rotor so air gap equal; move rotor to extreme rear.
- Place dial indicator on vertical surface of heat sink at rear of rotor shaft; measure rotor end play (approximately 3.81 to 7.62 mm); record F and divide by two for G.
- Move rotor to extreme rear; position straight edge across mounting ring diameter; measure distance to mounting ring surface (H) and hub mounting surface (I); subtract H from I for J.
- Bolt a standard set of 17 5N-4478 Plates together; measure thickness in two locations along contour; average as K.
- Determine number of shims: subtract B, E, G, K from J for L; divide L by 0.8 mm (0.03 inch) for M; round up.
- Put coupling plate in flywheel bore; check clearance between coupling plate outside diameter and flywheel bore inside diameter.
- Install coupling plate assembly, bolts (6) and calculated shims; tighten bolts (5) in 180 degree intervals in three stages to 525 + 25 N-m (390 + 20 lb ft).
- Install guide bolts in flywheel; put generator on engine; install bolts (10); tighten to 100 N-m (75 lb ft) in pairs at 180 degree intervals in three stages.
- While crane supports generator, place dial indicator on heat sink vertical surface; push generator forward within + 0.50 mm (+ 0.0200 inch) of midpoint of end play.
- Install fan mounting bolts (11) into flywheel; tighten to 200 N-m (150 Ib ft) in pairs at 180 degree intervals in three stages.
- Place dial indicators on no. 1 crankshaft throw and heat sink; push crankshaft forward; check crankshaft end play 0.178 to 0.635 mm and heat sink end play 0.076 to 0.635 mm; record N and O.
- If N or O is less than initial A, disassemble; check coupling plate for bowing; replace if bowed; check calculations; install generator and repeat steps 13 and 15.
Installation Of The Generator For Generator Sets That Are Not Equipped With A 3500 Engine installation
⚠ Damage to engine and generator can result if electric set is operated with a plate assembly that does not have proper clearance.
Tools: dial indicator, indicator assembly, bar, torque wrench, guide bolt, crane
- Remove dirt, burrs, paint from generator support and base contact surfaces; remove protective material from flywheel pilot bearing bore and coupling contact surface.
- Remove timing pointer cover; install indicator assembly on front of engine; tip contacts crankshaft pulley face.
- Position plate assembly in flywheel bore; check clearance between plate outside diameter and bore inside diameter.
- Install full shim pack and plate assembly on generator with bolts; tighten bolts to 525 + 45 N-m (390 + 30 lb ft).
- Install guide bolt in flywheel; put generator on engine; install bolts (9) and (10); tighten but do not bend locks under bolts (8).
- Use dial indicator to check crankshaft end play; if reading differs from initial, remove generator and enough shims to get original end play.
- Install generator again and check crankshaft end play; after correct shims, bend locks under bolts (8).
Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.
Common questions
What engine does the Caterpillar G3508 use?
The Caterpillar G3508 is powered by the Caterpillar G3508 engine.
What fuel does the Caterpillar G3508 use?
The Caterpillar G3508 runs on natural gas.
How much oil does the Caterpillar G3508 take?
The Caterpillar G3508 engine in the Caterpillar G3508 has an oil capacity of 356.0 liters.
What is the coolant capacity of the Caterpillar G3508?
The Caterpillar G3508 cooling system holds 114 liters (30.1 US gallons) for the engine, per the manufacturer specification sheet.
Which oil filter part number does the Caterpillar G3508 take?
The Caterpillar G3508 uses oil filter part number 1R-0716.
Parts
3| Part # | Description | Qty | System | |
|---|---|---|---|---|
| 1R-0716 | Engine Oil | 1 | Oil filter | Amazon eBay $44.90 eBay $44.90 NAPA $33.79 NAPA $33.79 KuduParts $80.00 FridayParts $81.99 |
| PEHJ0205 | G3508 Engine Upgrade Conversion to ADEM III & AFRC with NOx Sensor including Twin to Single Turbocharger | Turbocharger | Amazon eBay | |
| PEHJ0226 | Cat® G3508 Engine Upgrade Conversion to AFRC with NOx Sensor including Twin to Single Turbocharger | Turbocharger | Amazon eBay |
Service, wear & replacement parts referenced for this model and its engine — confirm the exact part for your serial number. See the full parts catalog to search and cross-reference.
Available documents
This page was generated from the 18 manufacturer documents above by automated extraction; every figure shown is copied from one of them. How the data is compiled.