The Cummins/Onan RDJF is a 2.3 L 4-cylinder naturally aspirated engine rated at 1800 rpm. It powers generator sets from Cummins/Onan, including the 17.5RDJF-3CR and 20W-20. It holds 6.15 L (1.6 gal) of oil and 11.36 L (3.0 gal) of coolant.

Also known as: Onan RDJF

2.3 L
Displacement
4
Cylinders
1800 rpm
Rated speed
6.15 L
Oil capacity

Engine specifications

Oil capacity6.15 L
Coolant capacity11.36 L
Displacement2.3 L
Cylinders4
AspirationNaturally Aspirated
Rated speed1800 rpm

Troubleshooting

39

Symptoms & remedies

SymptomCauseRemedy
No build up of AC output voltage — Is Field Breaker CB21 on control panel ON?Proceed to step 2 if YES; proceed to step 3 if NO
No build up of AC output voltage — Connect jumper wire across terminals of Field Breaker, CB21. Does AC output voltage build up?Field breaker defectiveIf voltage builds up REPLACE FIELD BREAKER; if not, proceed to step 4
No build up of AC output voltage — Push to reset Field Breaker. Does AC output voltage build up?If voltage builds up but is high, low, unstable, or causes tripping of Field Breaker, refer to Tables B, C, or D
No build up of AC output voltage — Disconnect alternator stator leads 1 & 2 from TB21-1 and TB21-2 on VR22. Is reference voltage across 1 & 2 20 VAC or more?Proceed to step 14 if YES; proceed to step 13 if NO
No build up of AC output voltage — Is exciter field voltage across F1+ and F2- on endbell terminal block 7.0 VDC or more?Wiring harness W9 from end bell to VR22 terminals 3 and 4 may be faultyIf not, check wiring harness W9 from end bell to VR22 terminals 3 and 4
No build up of AC output voltage — Are diodes CR1, CR2, CR3, CR4, CR5, CR6 in rotating rectifier assemblies OK?Defective diode(s) — check all diodes, more than one may be defective
No build up of AC output voltage — Flash exciter field. Is reference voltage across 1 and 2 now 20 VAC or more?Proceed to step 14 if YES; proceed to step 13 if NO
No build up of AC output voltage — Reconnect generator leads 1 & 2 to TB21-1 and TB21-2 on VR22. Does reference voltage build up?Proceed to step 15 if YES; proceed to step 13 if NO
No build up of AC output voltage — Is regulator DC output voltage across VR21-7 and VR21-8 7 VDC or more?Proceed to step 16 if YES; proceed to step 18 if NO
No build up of AC output voltage — Are SCR's CR13 and CR16 OK?Proceed to step 17 if YES; proceed to step 18 if NO
No build up of AC output voltage — Are diodes CR12, CR14, and CR15 OK?Proceed to step 18 if YES; proceed to step 18 if NO
No build up of AC output voltage — Replace voltage regulator PC board (VR21)Replace voltage regulator PC board (VR21)
AC output voltage builds up, but is unstable — Are there any loose or broken wires or connections on voltage regulator assembly VR22?Loose or broken wires or connections on voltage regulator assembly VR22Proceed to step 2 if YES; proceed to step 2 if NO
AC output voltage builds up, but is unstable — Is W9 (exciter field) wiring harness from VR22 to End bell OK?Proceed to step 3 if YES; proceed to step 4 if NO
AC output voltage builds up, but is unstable — Does adjustment of Damping Control R27 potentiometer on VR21 result in stable voltage?Proceed to step 4 if YES; proceed to Test Procedure A if NO
AC output voltage builds up, but is unstable — ReplaceReplace
Engine does not crank — Check 12 VDC to ground at battery BT1 and at starter motor B1. Check B+ present at TB11, K11, K13, S1, and M11.Proceed to step 2 if YES; proceed to Test Procedure A, G if NO
Engine does not crank — Is battery dead? Check if centrifugal switch S1 is open to ground. If S1 remains closed when set is shutdown, R11 and K14 will discharge through S1 to ground. Remove switch cover and check operation manually.Centrifugal switch S1 remains closed when set is shutdown, causing R11 and K14 to discharge through S1 to groundRemove switch cover and check operation manually
Engine does not crank — Replace S1. Replace or charge battery.Replace S1; Replace or charge battery
Engine does not crank — Jumper battery cable connection to ground at starter. Does engine crank?Proceed to step 6 if YES; proceed to step 7 if NO
Engine does not crank — Check starter motor. Repair or replace.Starter motor faultyRepair or replace
Engine does not crank — With S11 at START, is at least 7 volts present between terminal S on K11 and ground. Does K11 energize?Proceed to step 8 if YES; proceed to step 10 if NO
Engine does not crank — Does manual operation of K11 crank engine?Proceed to step 9 if YES; proceed to step 10 if NO
Engine does not crank — Jumper K11 from B+ to S terminal. Does engine crank?Proceed to step 10 if YES; proceed to step 11 if NO
Engine does not crank — Start relay K11 is defective; replace.Start relay K11 defectiveReplace
Engine does not crank — With S11 at START, jumper K11 contacts to starter solenoid. Does engine crank?Proceed to step 11A if YES; proceed to step 12 if NO
Engine does not crank — Replace K11.Replace K11
Engine does not crank — With S11 at START, jumper normally closed contacts of K12. Does engine crank and start?Proceed to step 13 if YES; proceed to step 10 if NO
Engine does not crank — Replace K12.Replace K12
Engine cranks but does not start — Is 12 VDC present between start terminal on S11 and ground (TB11-1) with S11 at START?Proceed to step 2 if YES; proceed to Test Procedure G if NO
Engine cranks but does not start — Is 12 VDC present between M11-B+ and ground TB11-1 with S11 at START? Check Wire W3 & W8.Proceed to step 3 if YES; proceed to step 4 if NO
Engine cranks but does not start — Replace faulty switch S11.Faulty switch S11Replace faulty switch S11
Engine cranks but does not start — Does engine operate on gasoline? Is fuel primer solenoid K3 energized when S11 is at START?Proceed to step 6 if YES; proceed to step 9 if NO
Engine cranks but does not start — Remove fuel solenoid from fuel line and press S11. Does fuel pulsate from line?Proceed to step 9 if YES; proceed to step 12 if NO
Engine cranks but does not start — Check lead from TB12-4 to fuel pump; check fuel pump and replace if necessary.Faulty fuel pump or lead from TB12-4 to fuel pumpCheck lead from TB12-4 to fuel pump; check fuel pump and replace if necessary
Engine cranks but does not start — Check engine oil level. If okay, remove LOP switch S4 lead at TB12-4. Does engine crank and run when S11 is pressed?Proceed to step 11 if YES; proceed to step 13 if NO
Engine cranks but does not start — Is lead 6 from TB12-6 to LOP switch S4 grounded?Proceed to step 12 if YES; proceed to Test Procedure G if NO
Engine cranks but does not start — Repair or replace lead 6 to S4.Lead 6 to S4 faultyRepair or replace lead 6 to S4
Engine cranks but does not start — If necessary, replace LOP switch S4.If necessary, replace LOP switch S4

Fault codes and symptom→remedy steps extracted from this engine’s service/owner documentation; verify against the official manual before servicing.

Common problems

6
  • Engine fails to start — little or no fuel flow from return line
    Cause: Fuel supply system problem
    Fix: Check fuel supply system: fuel tank empty?; shutoff valves closed?; fuel lines kinked?; loose connections?; clogged fuel filters?
  • Engine fails to start — fuel flows steadily from return line
    Cause: Preheat system problem
    Fix: Observe air heater thru air inlet; engage preheat; if heater element does not glow red within 30 seconds, check air heater and glow plug wiring: connections tight?; free from corrosion?
  • Stop circuit fails (set does not stop)
    Fix: Close fuel valve
  • Engine still does not start
    Fix: Contact authorized Onan service representative
  • Engine fires but does not start
    Fix: Repeat starting procedures, including preheat; limit cranking to 15 to 20 seconds to conserve battery; if engine still does not start, see "If Engine Fails to Start" information
  • Engine fails to start — little or no exhaust smoke (engine is not getting fuel)
    Cause: Engine is not getting fuel
    Fix: Prime fuel system; observe fuel flow from return line

Compiled from service & troubleshooting documentation across every generator set that uses the Cummins/Onan RDJF.

Maintenance schedule

ItemSpecCapacityPart #Interval
Air filterDry—
Fuel filter—
Oil filterFull Flow Type—
Battery—
Belt—
Coolant—
OilType: Light11.36 quarts—
Spark plug—

Pooled from every document that names this exact engine — confirm the interval and part number against your unit's serial number.

Service intervals

21
ItemActionHoursMonthsNotes
EngineInspect8 hr
Exhaust systemInspect8 hr
Fuel supplyCheck8 hrSee Note 1
Oil levelCheck8 hr
Air cleanerCheck50 hrMore often in dusty conditions
Crankcase oilChange100 hrFirst service — After first 50 hours of operation; drain while engine is still hot
Cylinder head boltsCheck50 hrFirst service — Retighten after first 50 hours on an overhauled engine
Valve clearanceAdjust50 hrFirst service — After first 2 to 50 hours of operation
Fuel condensation traps in lines and filtersDrain100 hr
Governor linkageClean100 hr
BatteryCheck200 hr
Oil filterReplace200 hr
Breather standpipesClean500 hr
Start-disconnect circuitCheck500 hr
Valve clearancesCheck500 hr
Primary fuel filterChange600 hr
Nozzle spray patternTest2000 hrTrained diesel injection personnel only (Note 2)
Rocker box oil line and orificesClean2000 hr
ValvesOther2000 hrGrind valves (if required)
Secondary fuel filterChange3000 hr
EngineOther5000 hrGeneral overhaul (if required)

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Service specifications

59
TypeItemValueUnitCondition
ClearanceCamshaft bearing clearance (original).0015-.0030inch
ClearanceCamshaft bearing clearance (replacement).0012-.0037inch
ClearanceCamshaft end play0.007-0.039inchroom temperature 70 F
ClearanceConnecting rod bearing clearance (original).001-.0033inch
ClearanceConnecting rod bushing clearance.0002-.0007inch
ClearanceConnecting rod end play.002-.016inch
ClearanceCrankshaft end play0.010-0.015inch
ClearanceCylinder bore honed diameter3.4995-3.5005inch
ClearanceExhaust valve guide clearance.0030-.0050inch
ClearanceMain bearing journal diameter2.2427-2.2435inch
ClearancePiston clearance in cylinder0.0055-0.0075inch90 deg to pin, below oil ring
GapOil pump gear lash0.005inch
GapPiston ring gap0.010-0.020inch
GapStarter armature end play.005-.030inch
GapStarter pinion clearance to pinion stop.070-.120inchSolenoid plunger bottomed
GapValve head to cylinder head face clearance0.030inchminimum
GapValve seat width.047-.062inch45 degree seat angle
PressureCylinder compression350-400psicranking at about 300 rpm
PressureDelivery valve line pressure300 to 600psiengine running
PressureExhaust back pressure limit27inches of waterrated load
PressureFuel pump vacuum15 to 18inchessea level
PressureFuel transfer pump pressure12-14psiat 1800 rpm
PressureInjection nozzle adjusted opening pressure1750psi
PressureInjection nozzle opening pressure1900 to 1950psi
PressureMinimum oil pressure at governed speed20psiinspect oil system if below
PressureNormal oil pressure25psiengine at operating temperature (or higher)
PressureOil bypass valve opening pressure25psi
ResistanceBattery specific gravity1.290 to 1.22575 percent charged
SpeedGovernor maximum governed speed2400rpm
SpeedStart-disconnect switch disengage speed900rpmabout
TemperatureCylinder head oven temperature for valve seat installation325deg Cabout 1/2 hour
TemperatureRing gear installation oven temperature380-400deg F30 to 40 minutes
TemperatureThermostat opening temperature150 +/- 2deg F
TemperatureTiming gear heating temperature350deg Felectric burner or oven
TorqueCenter main bolt (4 cylinder)97-102ft-lb
TorqueConnecting rod bolt27-29ft-lb
TorqueCylinder head bolt44-46ft-lb
TorqueCylinder head bolt (first step)25-30ft-lb
TorqueDelivery valve cap nut55-60ft-lb
TorqueDelivery valve holder75-80ft-lbMaximum
TorqueExhaust manifold nuts13-15ft-lbTighten evenly
TorqueFlywheel mounting screw65-70ft-lb
TorqueFuel pump mounting screws15-20ft-lb
TorqueGear case cover18-20ft-lb
TorqueGear cover mounting screws15-20ft-lb
TorqueGlow plug10-15ft-lb
TorqueInjection nozzle mounting screws20-21ft-lb
TorqueInjection pump mounting screws15-16ft-lb
TorqueNozzle cap nut50-55ft-lb
TorqueOil filterHand tight plus 1/4 to 1/2 turn
TorqueRear bearing plate40-45ft-lb
TorqueRocker arm nut4-10ft-lbFriction between threads only; used to adjust valve lash
TorqueRocker arm stud35-40ft-lb
TorqueRocker-box cover8-10ft-lb
Valve clearanceExhaust valve clearance (cold).017inchcold
Valve clearanceIntake valve clearance (cold).017inchcold
VoltageSolenoid voltage drop0.3Vmaximum
VoltageStarter circuit voltage drop (battery ground to block; battery positive to solenoid)0.6Vmaximum each
VoltageStarter frame voltage drop0.3Vmaximum

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Recommended fluids

FluidGradeStandardAmbientCapacityNotes
Coolant50-50 mix ethylene glycol anti-freeze and waterComplete change every year; rust inhibitors prevent corrosion
Engine oilMulti-grade such as 5W-30below 0°CRecommended for ambient temperatures of 32 F and colder
Engine oilSAE 10W below 30 F; SAE 30 above 30 FFrom nameplate oil recommendation
Engine oilSAE 15W-40 or 20W-40API CD/SE-10°C to 32°C6.5 U.S. quartsIncludes filter; CD/SE all viscosity grades, CC/SE only for 10W-30, 10W-40, 5W-30
FuelASTM 2-D or 1-D diesel fuelMinimum Cetane number 45Use ASTM 1-D below 32 F, during long light-load or no-load periods

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Procedures

12
Adjusting Injection Nozzle Opening Pressure adjustment

⚠ Do not adjust pressure without a testing fixture.

Tools: Diesel Nozzle Tester 420-0184

  1. Remove nozzle from the engine.
  2. Remove plug from center of cap nut and loosen cap nut.
  3. Install nozzle on a static fuel nozzle testing fixture.
  4. Adjust opening pressure to 1750 psi by turning adjusting screw.
  5. Clockwise increases pressure, counterclockwise decreases it.
Adjusting Valve Clearance adjustment

⚠ Four-cylinder engines do not have a BC mark on the flywheel.

Tools: Feeler gauge

  1. Rotate flywheel clockwise until No.1 cylinder is on compression stroke at TC mark.
  2. Turn 10-45 degrees past TC.
  3. Check clearance between rocker arm and valve with feeler gauge.
  4. Adjust with lock nut securing rocker arm.
  5. Turn flywheel 180 degrees for No.2, then No.4, then No.3 cylinder, adjusting each.
Testing Thermostat diagnostic

Tools: Thermometer

  1. Remove thermostat from cylinder head.
  2. Heat a pan of water to approximately 150 F.
  3. Suspend thermostat in water; it should start to open.
  4. Remove from hot water and allow to cool; it should close in a short time.
  5. Replace if it sticks or does not operate properly.
  6. Always install a new gasket when replacing the thermostat.
Flushing Cooling System maintenance

Tools: Flushing gun

  1. Drain radiator, cylinder block and exhaust manifold.
  2. Remove inlet and outlet hoses between engine and radiator.
  3. Close all drain plugs; attach flushing gun nozzle to water outlet.
  4. Restrict inlet opening until system fills with water, then apply air pressure gradually.
  5. Repeat until water from cylinder block flows clean.
  6. Remove flushing gun.
  7. Reinstall thermostats, hoses and drain plugs; refill with proper coolant.
  8. Check system for leaks.
Oil Filter Change maintenance

Tools: Filter wrench

  1. Place pan under old filter and remove by turning counterclockwise.
  2. Clean filter mounting area.
  3. Lubricate gasket on new filter with oil.
  4. Screw filter on clockwise until gasket touches mounting base.
  5. Tighten 1/2 turn.
Out-of-Service Protection (over 30 days) maintenance

⚠ Starter cranking is too fast; oil or inhibitor fluid will fire if cranked with starter.

  1. Run engine until thoroughly warm under at least 50 percent load.
  2. Shut down and drain oil base while warm; refill.
  3. Remove glow plugs, pour 1 ounce rust inhibitor into each cylinder, install glow plugs.
  4. Crank engine by hand only to distribute oil.
  5. Service air cleaner per Maintenance Schedule.
  6. Clean throttle and governor linkage; wrap with clean cloth.
  7. Plug exhaust outlets.
  8. Disconnect battery and follow standard storage procedure.
Returning a Unit to Service maintenance

⚠ Do not smoke while servicing batteries.

  1. Remove cover and protective wrapping; remove plug from exhaust outlet.
  2. Check warning tag on oil base and verify oil viscosity.
  3. Clean and check battery; measure specific gravity.
  4. Check fuel injectors and fuel lines are secure and correctly torqued.
  5. Clean radiator.
  6. Connect batteries.
  7. Verify no loads are connected to engine.
  8. Start engine.
Bleeding Fuel System operation

⚠ Return priming lever inward (disengaged position) to permit normal pump operation.

  1. Disconnect fuel return line.
  2. Operate hand priming lever on fuel transfer pump.
  3. Continue until fuel flowing from return line is free of air bubbles.
  4. Reconnect the fuel return line.
  5. If camshaft pump lobe is up, crank engine one revolution to permit hand priming.
Break-In Procedure operation

⚠ Continuous running under one half load during first few hundred hours may cause poor ring seating.

  1. Run one half hour at 1/2 load.
  2. Run one half hour at 3/4 load.
  3. Run at full load.
  4. Drain and replace crankcase oil after first 50 hours; drain while still hot.
Preheating and Starting operation

⚠ Do not exceed the one minute preheat periods.

⚠ Do not use ether as a cold weather starting aid.

  1. Engage PREHEAT switch 30 seconds if above 55 F, 60 seconds if below 55 F.
  2. Engage START switch while continuing preheat.
  3. Hold until engine comes up to speed.
  4. If engine fails to start in 15-20 seconds, repeat preheat and start.
  5. Verify oil pressure gauge reads at least 20 psi.
Stopping the Engine operation
  1. Push fuel solenoid switch to stop position.
  2. Release switch when set stops.
  3. If stop circuit fails, close fuel valve.
Fuel Transfer Pump Removal and Disassembly repair

⚠ Do not pry the cover and body apart; this would damage the diaphragm.

Tools: Screwdriver, File

  1. Remove pump inlet and outlet lines.
  2. Remove two cap screws holding pump to engine and lift off.
  3. Notch cover and body with a file; remove six screws.
  4. Tap body with a screwdriver to separate the two parts.
  5. Drive out rocker arm hinge pin.
  6. Remove rocker arm, spring and link.
  7. Lift out diaphragm assembly and diaphragm spring.

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Common questions

What is the oil capacity of the Cummins/Onan RDJF?

The Cummins/Onan RDJF engine has an oil capacity of 6.15 liters.

What is the displacement of the Cummins/Onan RDJF?

The Cummins/Onan RDJF has a displacement of 2.3 liters with 4 cylinders.

Which generators use the Cummins/Onan RDJF engine?

The Cummins/Onan RDJF powers 2 generator set(s), including Cummins/Onan 17.5RDJF-3CR, Cummins/Onan 20W-20.

What is a common problem with the Cummins/Onan RDJF engine?

A commonly reported issue on generators using the Cummins/Onan RDJF is: Engine fails to start — little or no fuel flow from return line. Cause: Fuel supply system problem. Fix: Check fuel supply system: fuel tank empty?; shutoff valves closed?; fuel lines kinked?; loose connections?; clogged fuel filters?.