| Clearance | Camshaft end play (new) | 0.10 to 0.55 | mm (0.004 to 0.022 inch) | Maximum permissible end play of a worn camshaft 0.60 mm (0.023 inch) |
| Clearance | Clearance between the bearing shell and the main bearing journals | 0.057 to 0.117 | mm (0.0022 to 0.0046 inch) | |
| Clearance | Connecting rod bearing clearance | 0.030 to 0.081 | mm (0.0012 to 0.0032 inch) | |
| Clearance | Cylinder bore | 105.000 to 105.025 | mm (4.1338 to 4.1348 inch) | |
| Clearance | Cylinder head thickness | 117.95 to 118.05 | mm (4.643 to 4.647 inch) | Minimum thickness 117.20 mm (4.614 inch) |
| Clearance | Distributor shaft end play | 0.003-0.010 | in | |
| Clearance | Front gear cover oil seal installation depth | 1-1/32 | in | rear spring side of casing from gear cover mounting face |
| Clearance | Fuel injection pump installation dimension | 3.260 | in | new camshaft; instead of 3.254 |
| Clearance | Maximum permissible wear for the cylinder bore | 0 to 0.15 | mm (0 to 0.0059 inch) | |
| Clearance | Original size of the connecting rod bearing journal | 63.47 to 63.49 | mm (2.4988 to 2.4996 inch) | |
| Clearance | Original size of the main bearing journal | 76.159 to 76.180 | mm (2.9984 to 2.9992 inch) | |
| Clearance | Prestolite starting motor pinion clearance to pinion stop | 0.070-0.120 (1.78-3.05) | in (mm) | solenoid plunger bottomed |
| Clearance | Starter gear lash | .020 - .010 | in | pinion/ring gear engagement |
| Clearance | Starting motor armature end play | 0.005-0.030 (0.127-0.762) | in (mm) | |
| Clearance | Valve guide inside diameter | 9.000 to 9.022 | mm (0.3543 to 0.3552 inch) | |
| Clearance | Water pump impeller clearance (A-A) | zero to 1/16 (1.6) | in (mm) | with drive belt off |
| Gap | Breaker point gap - static (full separation and engine cold) | 0.020 (0.51) | in (mm) | full separation, engine cold |
| Gap | Centrifugal switch point gap | 0.040 | inches | |
| Gap | Point gap | 0.016 | in | equals 20 degrees BTC ignition timing and spark advance |
| Gap | Spark plug gap | .035 | in | increased from .025 (0.64 mm) for light-load smoothness |
| Gap | Spark plug gap (MJB) | 0.025 (0.64) | in (mm) | |
| Gap | Spark plug gap (MJC/RJC) | 0.035 (0.89) | in (mm) | |
| Gap | Start disconnect point gap | 0.020 (0.51) | in (mm) | |
| Other | Battery specific gravity when 75 percent charged | 1.290 to 1.225 | | 75 percent charged |
| Other | Bosch EPVE fuel injection pump plunger lift | 1.55 | mm (0.0610 inch) | |
| Other | Breaker point spring tension | 17-20 | ounces | rubbing block off the cam |
| Other | Carburetor main jet adjustment | 1-1/2 to 1-3/4 | turns open | NHC-MS normal adjustment |
| Other | Connecting rod torx screws - additional turn | 120 | degrees | |
| Other | Cranking limiter limits cranking time | 45 to 90 | seconds | depending on ambient temperature |
| Other | Cylinder head bolts - additional turn (long bolts) | 270 | degrees | |
| Other | Cylinder head bolts - additional turn (short bolts) | 225 | degrees | |
| Other | Ignition timing with spark advance | 24 | degrees BTC | after initial timing change to 5 degrees BTC |
| Other | Initial ignition timing | 5 | degrees BTC | CCKB-MS/2861J and CCKB-MS/2900J magneto ignition with electric start |
| Other | Injection timing advance | 2 | crank degrees | 4-cylinder J Series diesel; advance from 19 to 21 degrees BTC PC |
| Other | Piston height above cylinder block | 0.21 to 0.35 | mm (0.008 to 0.014 inch) | |
| Other | Rotor diameter | 4.420 | in | acceptable; replace rotors measuring 4.415 in or less |
| Other | V-belt tension | 535 | N (120 lb) | Initial belt tension; used belt tension 355 N (80 lb) |
| Other | Voltage adjust rheostat adjustment | plus or minus 5 | percent | |
| Other | Water temperature regulator minimum stroke at full open temperature | 10 | mm (0.3937 inch) | |
| Pressure | Compression (new engine cranking at about 300 rpm) | about 100 | psi | cranking at about 300 rpm |
| Pressure | Cylinder compression variation limit between cylinders | 350 | kPa (51 psi) | |
| Pressure | Engine oil pressure minimum at maximum engine speed and normal operating temperature | 300 | kPa (43 psi) | at maximum engine speed, normal operating temperature |
| Pressure | Expansion tank fill cap (marine) | 12-15 | psi | |
| Pressure | Fuel injector service setting injection pressure | 29.4 ± 0.8 | MPa (4264 ± 116 psi) | Leakage in 10 seconds = 0 drops |
| Pressure | Fuel pressure at idle (all fuel injection pumps) | 25 | kPa (3.6 psi) | at idle |
| Pressure | Fuel pressure at rated speed (all fuel injection pumps) | 23 | kPa (3.3 psi) | at rated speed; maximum 75 kPa (10.9 psi) |
| Pressure | Fuel pump pressure (crank) | 1-2 | psi | cranking engine over several times |
| Pressure | Fuel pump pressure (running) | 2-3 | psi | gauge held 16 inches above fuel pump |
| Pressure | Low oil pressure while cranking | 8-10 | lbs | 2.7 AJ RV with LOPKO |
| Pressure | Normal oil pressure | 25 or higher | psi | engine at operating temperature |
| Pressure | Normal oil pressure at operating temperature | 20 | PSI | 2.7 AJ RV |
| Pressure | Oil by-pass valve opening | about 25 | psi | |
| Pressure | Pressure cap rating | 15 (103.5) | psi (kPa) | |
| Pressure | Pressure to open engine oil filter bypass valve (replaceable element) | 130 to 170 | kPa (19 to 25 psi) | |
| Pressure | Pressure to open engine oil filter bypass valve (spin-on oil filter) | 80 to 120 | kPa (12 to 18 psi) | |
| Resistance | Brushless exciter field leads resistance | 12.2 + 10% | ohms | at 20 C (68 F.) |
| Resistance | Brushless exciter rotor lead pairs T1-T2, T2-T3, T1-T3 | 0.5 to 0.6 | ohms | at 20 C (68 F.) |
| Resistance | Commutating reactor CMR21 any terminal to reactor frame | infinity | | |
| Resistance | Commutating reactor CMR21 between 1-2 and 3-4 | 0.4 | ohms | |
| Resistance | Commutating reactor CMR21 between 1-3, 2-3, 1-4, or 2-4 | infinity | | |